Welcome to MateFord Electronics (Dongguan) Co, Ltd..!

Blog


Application Field

19 Aug,2025

When the components are used in special applications that require extremely high reliability (life support equipment, atomic energy, aircraft, satellites, etc.), please contact us in advance. And, in this case, make sure to install the components on the actual equipment for evaluation and confirmation.

View details

Welding

19 Aug,2025

1. The welding must be carried out within the specified temperature, time and application times of each component. If the components are heated to high temperatures for a long time, the color of the body and its characteristics may change, and the connection may even be disconnected.

2. After welding, please keep it stress-free until it cools down.

3. After soldering, please make sure not to apply any mechanical stress to the terminal area, otherwise it may cause the printed board to warp.

View details

Insert and Install

19 Aug,2025

1. Cover the coating to ensure the performance of the components. Please do not use pliers or pointed pliers to make improper adjustments to the automatic installation to avoid any damage or excessive impact to the coating. They may cause characteristics to change, disconnect or break.

2. Do not use fallen parts or used parts.

3. Make sure to avoid heat radiation generated by other heating components.

4. If molding or additional coating is needed after installing the components, please consult us in advance.

5. When assembling, please be careful not to generate static electricity on the parts.

View details

Pulse Tolerant

19 Aug,2025

1. If the components are used in circuits containing pulse wave current (single pulse, repetitive pulse) or surge current, please consult us in advance.

Please note that it is necessary to consider the deviation of tolerance values of other components together with the actual circuit.

View details

Storage Conditions

19 Aug,2025

1. Keep the components away from high temperature, high humidity, direct sunlight, high temperature, corrosive sulfur, chlorine, acid and alkali.

2. Please try to use it within six months after delivery.

View details
< 1234 >

Product Inquiry


* We will contact you within one business day—please make sure to leave your contact information.